E19 Tunnel E190019
A rule sign gives road users a rule or indicates a road point where the traffic rule associated with the sign is applied.
E19 Tunnel E190019
The traffic rules valid in the tunnel must be followed in the road section limited by signs E19 and E20. The sign is placed on the right side of the carriageway. If there are two or more lanes in the oncoming direction, a similar sign is also placed on the left side of the lane.
Traffic sign materials and standard
We use 3 mm aluminum composite or aluminum plate as basic materials. The cover film is Avery Dennison's reflective films. If the road signs are CE marked, the plate and bracket are sold as a package. The price of the bracket is €4.50/piece, sales of 2 pieces/brand, VAT 0%. The production of traffic signs is based on the standard EN 12899-1:2007. EN 12899 is a European standard that is valid in all EU countries.